Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
What Lies Below
08-27-2014, 06:28 AM
Post: #1
Big Grin What Lies Below
This article and others that follow is going to be dedicated to home repair and improvement working with different places from roof to basement.

This means trying out your tile, sheet plastic, or ceramic tile and underlayments you must be sure there are no signs of water damage to the subflooring and check always to see if it is strong throughout - if you are likely to re-do the bathroom floor. When laying down a brand new floor the key question is definitely can I lay tile over the floor or do I've to pick up the old one first? If the floor is level and sound you can often only tile right over it with plastic or vinyl floor, but keep in mind how much room you've for your bathroom door, door frame and wall molding (if any) you may have to open or close the door from time to time!

If you can, if the underlayment is reliable but not quit level leveling embossers can be used by you (like mortar) to fill-in low areas to produce a level surface, otherwise place a brand new underlayment over it. I've seen homeowners doctor it up with thin simple wood pieces dont do it! All materials have to be water and water resistant as you are able to. Always use at least an amount to guarantee area isn't slanted by any means.

For a typical ground-level home-like a ranch with no attic, floor foundations are 'framed', indicating the floor sits on joists with 2-by's (photos) running perpendicular to the joists along the base. 'Girders', (steel rods) at or near the middle of the joists help in support. Above-the framework lies the subfloor, generally a 3/4' tongue and groove chemical board, plywood or similar material. Above that there is a1/4' plywood or cement board (moisture resistant) thats named the underlayment and could also have a sheet of roofing felt or similar material for extra padding. Just take extra caution when because the floor might break if the looks putting underlayment over the subflooring match-up so it is far better stagger the seams.

Ceramic Tiles: Because this sort of tiling is becoming popular in kitchens, bathrooms, halls and also living spaces for its durability and style, I do want to give this section on the subject.

Installing ceramic tiles in the bath-room can alter the height of features like mirror sinks, toilets and cabinets as well as the door and adjoining room it is most beneficial to remove everything and start from scratch. What this means is removing the old underlayment as well. You have to produce a level surface or the tiles will crack or break. So you will have up-to put into the old floor assuming you'd plastic tile or vinyl in the first place many ceramic floor tile is thick. You'll be offsetting the level of the old features and the door so a little of trimming might be necessary (If you are replacing fixtures-no problem).

For tiling bathroom floors these actions provides you with great results:

* Using a 3/ft level check if the ground even all through.

* Construct a-row of tiles, with spacers (cross-shaped inserts for grout lines) along the length and breadth of the room to gauge how many tiles you're using. That is and also to observe many hardwood cuts you'll need to make near walls.

* Lay down concrete board, cut to fit place and work with a small layer of mortar to connect board to subflooring. Use screws every 6 to 8 inches along the edges of table to secure in place. Use mesh record over the joints and cover with a thin layer of mortar.

* Using a trowel use mortar about every 3 1/2 at any given time and use easy even strokes. My sister learned about garage door repair santa monica chat by searching Yahoo.

* Set the entire ceramic tiles in a point farthest from entrance and press down firmly, touching it with a rubber mallet so it spreads evenly. Have the cut tiles ready in order you move away from the wall place and set as you go.

* place cross shaped spacers o-n end between each tile to guarantee rows are even. At sides put spacers smooth and butt tiles at the sides (dont fear, it will be same with). You can also stand the upright against walls.

* When you get to the closet flange (toilet hole-in floor) you will require a tile nipper or tile found to cut a incomplete group. My friend learned about read more by browsing Yahoo. Visit gate repair los angeles chat to discover the inner workings of this activity. Do that for many sides and lay tile down as before. You must do this for cabinets and sinks.

* When all the tiles are down you must wait a least 1 day for it to create correctly this really is an essential step before you set down the grout. When ready, mix tile grout to include about of the area at a time, this can give you time to do to right. Clicking understandable perhaps provides aids you could tell your sister. Sign up for the cross spacers and apply grout with a grout float, then holding float at an angle press off excess grout. Do that with step with the rest of the area.

* The last step will be to lower a clean sponge with water and clean off the entry grout, rinsing the sponge frequently..
Quote


Forum Jump:


User(s) browsing this thread: 1 Guest(s)

Contact Us | Super 8 Beijing | Return to Top | Return to Content | Lite (Archive) Mode | RSS Syndication